Contemporary apartments - Domestic fire sprinklers
Full domestic concealed sprinklers to all apartments in a new build block to BS9251.
Full domestic concealed sprinklers to all apartments in a new build block to BS9251.

A listed windmill that had remained empty and derelict for many years was granted planning permission to convert into a residential property.
Read more...
The Meeting House is almost unique in the Black Country as a building over 300 years old.....
Read more...
Due to the additional height of the house (effectively 3 storeys), and the open plan nature of the spaces inside, residential fire sprinklers...
Read more...
Statistical analysis of fire incidents indicated that the communal bin stores were experiencing a very high incidence of ignition.
Read more...
An independent fire risk analysis of twin residential tower blocks, indicated that the ground floors had several areas that were at risk.
Read more...
A small development of about 30 homes was being planned. At the back of the site 4 semi-detached were to be built, accessed by a narrow driveway.
Read more...
A small prestigious development, including 3 contempory town houses, 8 stylish apartments, and 3 luxurious penthouses with roof garden.
Read more...
Diesel engine compartments on working boats. Confined spaces with a requirement for a fixed pre-piped CO2 system, operated manually.
Read more...Fire Safety Officers determined that kiosks and merchandise posed a fire risk, and requested a suitable fire suppression system.
Read more...
A rugged and simple automatic solution was called for, together with a requirement for the systems to be self-powered.
Read more...
Fires underground in deep coal mining operations can be very hazardous, as the environment is particularly susceptible to fires.
Read more...A small fire suppression system using a clean gas agent was required to protect a compact telecommunication room.
Read more...
Engine fires in commercial vehicles are very damaging, often resulting in the complete loss of the vehicle.
Read more...
As part of a National Grid project, the construction of a 20 km cable tunnel beneath London was planned to house 400kV high-voltage electrical cables.
Read more...
During the design stages, Architects identified eight internal disposal hold rooms that were a potential fire hazard.
Read more...Diesel fuel load in enclosed engine test cells during automatic testing. Duration tests continued overnight, with minimal supervision.
Read more...